Skip to main content

Capstone Project (CAR T) Intro

Objective

For the Capstone Project, you will apply your learnings throughout the week to modify and extend CAR T Processing. Working in groups, you will use provided requirements to implement the changes requested by Manufacturing Operations.

Eachmember of the group will complete the Capstone Project in their own L7|ESP instance.

Learning Outcomes

  • Execute a Change Request to modify an existing Recipe

  • Add formatted instructions to a Batch Record

  • Create Sub-Steps and Sub-Step tables

  • Create a Signature Flow and assign it to a Step

  • Leverage L7|ESP Expressions to create data links

  • Link a Product to a Recipe

  • Assign a Kit to a Batch

  • Configure inventory fields to only use Items in a Kit

  • Create a new Entity Type and ID Sequence for a Sample Point

  • Assign Specifications to a Step

Scenario

In an effort to fully digitalize CAR T manufacturing, Change Requests have been approved for CAR T Processing. The existing Recipe needs to be modified and extended to include Cell Expansion, to do so you will make a copy of the existing Recipe and make the modifications in the new copy.

Manufacturing Operations would also like to link a new CAR T Product to this Recipe.

Note

Change Requests should be processed sequentially.

Schedule

Activity

Time

Introduce Capstone

10 min

Stage 1: Data Models

60 min

Debrief

5 min

Break

15 min

Stage 2: Process Models

90 min

Debrief

15 min

Closing Notes, Q&A

5 min +